Port of Virginia aims to have channels deeper and wider than the Port of Los Angeles

From The Virginian-Pilot: A rough draft of a plan backed by the U.S. Army Corps of Engineers recommends that the Port of Virginia be allowed to dredge its main shipping channels to 55 feet, down from 50 feet, and to widen them...

Read More